Hour Zero Radio Forums

Go Back   Hour Zero Radio Forums > General > Anything Goes
Connect with Facebook

Reply
 
Thread Tools Display Modes
Old 06-15-2010, 10:53 AM   #1
|D|
Your friendly DJ
Points: 833, Level: 16 Points: 833, Level: 16 Points: 833, Level: 16
Activity: 80.0% Activity: 80.0% Activity: 80.0%

 
|D|'s Avatar
 

Join Date: Sep 2009
Location: Bowman, GA
Posts: 25
Z-Points: 10,213
Thanks: 0 Time(s)
Thanked: 0 Time(s)
Likes: 0 Time(s)
Liked: 0 Time(s)
Downloads: 1
Uploads: 1

Default Studio Construction Blog

In this thread I will post the status of our new studio construction. Studio Zer0 is being built in an already existing structure previously used for storage. The contents within are still cluttering up the place, so in order to construct, the clutter must first be removed. The studio will be 12'x12'.

PROGRESS

06.15.10 | Most of the clutter is removed. Soaring temperatures are keeping me from being able to work most of the day. Once all of the junk is removed in a 12x12 radius, we may then begin construction.

06.17.10 | The clutter has been removed!


Server Rack


Cleared 12x12 area


The other side of the building (where the clutter went! XD Also stuff from our house
|D| is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 06:28 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
©2001-2010 by PixelFX Studios for vBCredits I v1.5.0 Gold Design By |D| of Hour Zero Radio