In this thread I will post the status of our new studio construction. Studio Zer0 is being built in an already existing structure previously used for storage. The contents within are still cluttering up the place, so in order to construct, the clutter must first be removed. The studio will be 12'x12'.
PROGRESS 06.15.10 | Most of the clutter is removed. Soaring temperatures are keeping me from being able to work most of the day. Once all of the junk is removed in a 12x12 radius, we may then begin construction. 06.17.10 | The clutter has been removed! ![]() Server Rack ![]() Cleared 12x12 area ![]() The other side of the building (where the clutter went! XD Also stuff from our house |
||||||||
|
|
|
![]() |